Tag
#inspection
37 topics across all disciplines.
Inspection and quality control — ITPs, hold points and NCRs
How work gets inspected and accepted on an EPC project. What an inspection and test plan is, the difference between a hold point and a witness point, what a non-conformance report does, and why the disposition is an engineering decision rather than an inspector's.
Inspecting an installed refractory lining — and repairing it properly
What an inspector looks for once the material is on the wall, why hammer test criteria come from the specification rather than the standard, and the repair rules that matter most — cut out entirely, never build up over existing material, and get the method approved first.
Why refractory linings fail — reading the damage back to its cause
Steam spalling, thermal shock, laminations, voids, erosion, chemical attack and anchor failure — what each looks like, and which decision made on site during installation produced it.
Welding processes, WPS and NDT — what happens before an arc is struck
SMAW, GTAW, GMAW and the rest, explained by what they are good at. Then the paperwork that makes a weld legal — WPS, PQR and welder qualification — and how welds are inspected.
Storage tanks — the simplest equipment with the largest consequences
Why the vapour space is the whole design question, how a tank breathes, why overfill protection must be independent of the gauge, and why a tank is far weaker against vacuum than pressure.
Material degradation — sensitisation, hardness limits and galvanic attack
Why welding can ruin the corrosion resistance of stainless steel without touching the weld, what the three conditions for galvanic corrosion are and which one to break, why sour service controls hardness rather than strength, what carbon equivalent predicts, and why zinc and stainless are kept apart.
Risk-based inspection — deciding what to inspect, and how often
Why nobody inspects everything equally, how likelihood and consequence combine into an inspection plan, why naming the damage mechanism is the whole job, and the ways an RBI programme quietly goes wrong.
Corrosion loops and piping circuits — the two groupings an RBI study is built on
Why a corrosion loop and a piping circuit are different things, how each one is drawn and bounded, what goes wrong when a circuit is too big or a loop mixes two streams, and why every number downstream depends on getting these right.
Non-destructive examination — choosing the method and reading the result
Why every NDE method is blind to something, what magnetic particle cannot do on stainless, why ultrasonics can miss a crack lying the wrong way, the difference between an indication and a defect, and why the examiner's qualification is part of the result.
Inspection and test plans — hold, witness, review, and who signs
What an ITP actually is, how it is built line by line from the code and the specification, what each of the four intervention levels obliges, why a document full of hold points is worse than a short one, and the notification failure that turns a witness point into nothing.
Section IX essential variables — what invalidates a procedure qualification
Why a WPS can be revised freely in some respects and requalified from scratch in others. Essential, non-essential and supplementary essential variables, the ranges a PQR actually qualifies, and the low-temperature trap that turns a harmless change into a requalification.
Examination extent and progressive sampling — what five per cent actually obliges
How fluid service sets the amount of examination, why the sample has to represent each welder on each procedure, and the progressive sampling rule that turns one rejected weld into a widening scope — the part of Chapter VI taught almost nowhere.
Inspector competence and certification — who may interpret, and who only operates
SNT-TC-1A as an employer's written practice rather than a certificate, ISO 9712 as the independent route, what Levels I, II and III may each do, and why the inspector's own qualification is the first thing a client audits.
Non-conformance and corrective action — the four dispositions, and why NCRs repeat
Writing an NCR somebody can act on, the difference between rework, repair, use-as-is and reject, who may grant a concession, and why closing non-conformances one at a time without ever raising a corrective action guarantees the same defect next week.
Reading a WPS and a PQR — what is on the sheet and what the tests proved
The practical document skill — what each field on a welding procedure specification is for, what a qualification record actually recorded, and what tensile, bend, impact, macro and hardness results each demonstrate about the joint.
Welder qualification and continuity — the ranges a ticket covers, and the register nobody updates
What a welder performance qualification actually establishes, the ranges it carries in thickness, diameter, position and process, how continuity lapses at six months, and why the expired ticket is always found after the weld is made.
Joint preparation and fit-up — the hold point you only get once
Bevels and root gaps, internal misalignment and the limits on it, why trimming or counterboring is allowed where grinding the bore is not, tack welds as part of the final weld, and what an inspector checks in the minutes before the root goes in.
Preheat and post-weld heat treatment — hydrogen, hardness, and reading the chart
What preheat is actually for, why interpass temperature has a ceiling as well as a floor, when PWHT is required and when it may be exempted, how to read a chart recorder trace against the specified cycle, and the hardness survey that decides it in sour service.
Pressure test packs and reinstatement — the gate, and what gets put back afterwards
What a test pack contains and why it is built as the work proceeds, the procedure and the calibrated gauge, the falling pressure that is temperature rather than a leak, and the reinstatement register that is what actually keeps a tested system honest.
Ex installation and inspection — where compliance is actually won or lost
Certified equipment is the easy part. Glands, unused entries, flame paths, IS segregation and the inspection regime are where hazardous area compliance is genuinely decided.
Structural steel connections — bolting, pretension and erection
The difference between a bearing connection and a slip-critical one, what pretension actually does and why it needs hardened washers, how a tension control bolt tells you it is done, why slotted holes exist and what they must not be used for, and what to check before a crane lifts anything.
Steel metallurgy and weldability
What the chemistry on a mill certificate actually controls, why carbon equivalent decides whether a joint needs preheat, what the heat-affected zone is and why its coarse-grained band is the weakest part of a good weld.
Stability, buckling and the design basis
Why most steel members fail by going sideways rather than by yielding, what slenderness and effective length really mean, the three buckling modes an inspector must recognise, and why section loss is so much worse than it looks.
Inspecting and repairing structures — the other forty years
Construction is a small part of a plant's life. What degrades, why the worst mechanisms are the hidden ones, how risk-based inspection decides where to look, and why structures quietly become overloaded.
How steel corrodes, and how coatings stop it
The corrosion cell in plain terms, the six mechanisms that actually perforate plant steelwork, why galvanic pairs and crevices do the damage, and how surface preparation — not paint choice — decides how long a coating system lasts.
Fatigue and fracture in structural steel
Why welded steelwork cracks at loads far below yield, how EN 1993-1-9 detail categories work, what a fatigue fracture face tells an inspector, and how brittle fracture differs from fatigue and why cold weather changes the answer.
Fire and impact damage to structural steel
How steel loses stiffness and then strength as it heats, what fire protection actually buys you, how to read the temperature a fire reached from the wreckage it left, and how to decide whether a fire- or impact-damaged member is reused, tested or cut out.
Structural NDT and inspection access
How to choose a non-destructive testing method from the flaw you expect rather than from habit, what each method is blind to, and how scaffold, platforms, rope access and drones decide what a structural survey can actually cover.
Bridge types and how each one carries load
Girder, truss, arch, cable-stayed and suspension bridges explained by the path the load takes to the ground — and why that path decides which members are fracture-critical, where an inspector must look first, and what a single failure would do.
Prestressed and post-tensioned concrete
Why concrete is squeezed before it is loaded, the difference between pre-tensioning in a casting yard and post-tensioning on site, how losses eat a third of the force you paid for, and why a grout void inside a duct is the most dangerous defect in modern bridge engineering.
Bearings and expansion joints
Every long structure moves, and bearings and joints are what let it. The types you will meet, how to read a movement calculation, why a seized bearing damages the pier rather than the deck, and why joints leak onto the most expensive parts of a bridge.
Non-destructive testing of concrete
Concrete hides everything that matters about it. Each NDT method answers one narrow question, none of them answers whether the structure is sound, and the rebound hammer does not measure strength no matter what the report says.
Marine and jetty structures
A product jetty is a structure that has to survive seawater, absorb the kinetic energy of a loaded tanker, and be inspected in the few hours a day the tide allows. Each of those three things decides a different part of its design.
GD&T fundamentals
Why plus-minus dimensioning fails on real parts, how to read a feature control frame, the fourteen geometric characteristics, and what the maximum material condition modifier actually buys you.
Datums and datum reference frames
Why three datums and not one, how 3-2-1 location removes six degrees of freedom, what datum precedence actually changes, and why the fixture, the gauge and the drawing must all agree.
Measurement and gauging
Micrometers, height gauges, CMMs and functional gauges compared, why the 10 to 1 rule governs gauge choice, what measurement system analysis is really asking, and why temperature quietly ruins precision work.
Checking fixtures and functional gauges
What a checking fixture does that a CMM cannot, how a functional gauge turns a GD and T callout into a part that either fits or does not, why gauge tolerance eats the part tolerance, and where scanning belongs.
