What the plant actually does — the shape of a process
Every plant is built from the same short list of unit operations. How a refinery, a petrochemical complex and a pharmaceutical plant differ, and why the process engineer's decisions land on everyone else's desk.
Distillation columns — reflux, reboil and the operating window
Why one boiling stage is never enough, what reflux actually buys you, how trays and packing do the same job differently, and why a column has a narrow range it will work in.
Reading a PFD and the material balance — where every number starts
What a process flow diagram carries that a P&ID does not, how to read a stream table, why mass in equals mass out is the most useful check on a plant, and how design cases become equipment sizes.
Plant utilities — steam, air, nitrogen and cooling water
Why the steam header pressures are what they are, what a steam trap actually does and how it fails, why instrument air and plant air must never share a header, and the reason nitrogen kills more people on plants than almost anything else.
Inspection and quality control — ITPs, hold points and NCRs
How work gets inspected and accepted on an EPC project. What an inspection and test plan is, the difference between a hold point and a witness point, what a non-conformance report does, and why the disposition is an engineering decision rather than an inspector's.
Intermediate
Builds on the basics
Relief and flare systems — what happens when pressure wins
How relief scenarios are worked out, why the governing case is rarely the obvious one, and why nearly every part of a flare exists to stop it becoming the hazard it was built to remove.
Fired heaters — an open flame next to a hydrocarbon inventory
How a furnace is arranged, why the process fluid and flue gas travel in opposite directions, what draught and excess air actually control, and why the purge before light-off is never negotiable.
Heat integration — why the plant reuses its own heat, and what that costs
Feed-effluent exchangers, the temperature approach trade-off, why steam comes at several pressures, and why a well-integrated plant is cheap to run and hard to start.
Start-up and shutdown — the hours when plants break
Why most process incidents happen during transitions rather than steady running, what purging and inerting are protecting against, why a controlled shutdown and a trip are not the same event, and why the first start-up after a turnaround is the most dangerous shift of the year.
Water and effluent — the largest flow on the plant, and none of it is product
Why boiler feed water needs to be purer than anything else on site, what cooling tower chemistry is actually managing, and why effluent problems announce themselves months late.
Refractory materials — castable, plastic, gunning mix and fibre
What each monolithic refractory family is, why a lining is usually two layers rather than one, the properties that trade against each other when a material is chosen, and why strength and insulation pull in opposite directions.
Refractory anchoring — holding a ceramic lining onto a steel wall
Why a lining needs anchors at all, the V, Y, hexmetal and ceramic arrangements and where each belongs, why anchor tips are coated before the refractory goes on, and why an anchor is the part of the system most likely to decide when the lining fails.
Installing refractory — casting, gunning, ramming and hand packing
The four ways monolithic refractory gets onto a wall, what decides quality in each, why rebound is never reused, why self-levelling castables must not be vibrated, and why plastic refractory may not have water added on site.
Water, mixing and flash set — making the material on site
Why water content decides what a castable lining becomes, the water quality limits and why stainless steel tightens the chloride one, what a dirty mixer does, how flash set happens, and the temperature window installation has to sit inside.
Curing and dryout — the two jobs that destroy linings when rushed
Why curing and dryout are opposite tasks in sequence, why a hydraulic bonded castable is kept wet and a chemical setting one kept dry, what steam spalling is, and why thermocouple placement decides whether a dryout schedule means anything.
Testing refractory — the five quality control tests and what each proves
Density, cold crushing strength, permanent linear change, abrasion loss and workability index — what each measures, why the testing laboratory must be independent of the refractory contractor, and why a gunned specimen is crushed in a different direction from a cast one.
Inspecting an installed refractory lining — and repairing it properly
What an inspector looks for once the material is on the wall, why hammer test criteria come from the specification rather than the standard, and the repair rules that matter most — cut out entirely, never build up over existing material, and get the method approved first.
Why refractory linings fail — reading the damage back to its cause
Steam spalling, thermal shock, laminations, voids, erosion, chemical attack and anchor failure — what each looks like, and which decision made on site during installation produced it.