Notes
The topics on this site are reference material, written to stand alone and kept current. Notes are the other thing: a code edition changing, a figure we got wrong and corrected, a question that comes up often enough to be worth answering in public.
There is no schedule. A note appears when something is worth writing down, which is a slower rhythm than a blog and a more useful one.
Cp or Cpk — and why is Ppk different again?
Cp measures spread, Cpk measures spread and aim together, and Ppk measures what the customer actually received. The gaps between the three numbers tell you what is wrong with the process, which is more useful than any one of them alone.
IATF 16949
Does a Class 150 flange mean 150 psi?
It does not, in either direction. A Class 150 carbon steel flange holds nearly twice that when cold and barely a third of it when hot. The class is the name of a rating curve, not a number you can use.
ASME B16.5
Is a 2-inch pipe two inches? And is Schedule 40 one wall thickness?
No to both, and the two answers are connected. NPS is a name rather than a dimension, and a schedule number is a rule for setting wall thickness, not a value. The practical consequence is that changing schedule quietly changes your hydraulics.
ASME B36.10M
Is IP68 better than IP66?
Not for the thing most plants actually do to their equipment. The second digit stops being a ladder after 6 — immersion and jetting are different tests, and passing one does not imply the other. That is why dual ratings exist.
IEC 60529
Is M25 the same as C25/30?
It is not, and treating them as equal gives you concrete about 17% weaker than the design asked for. The Indian M number is a cube strength; the European C designation quotes cylinder strength first. M25 is closer to C20/25.
IS 456 · EN 206
Why does 4–20 mA start at 4 and not 0?
Because zero has to mean something. A live zero separates a genuine reading of nothing from a cut wire, and the 4 mA has a second job — it powers the transmitter that produces it.
NAMUR NE 43
Is Zone 1 the same as Division 1?
No, and the mismatch is not symmetrical. Division 1 covers both Zone 0 and Zone 1, so converting a drawing from one system to the other by substitution loses the distinction that matters most. The gas group letters then run in opposite directions.
IEC 60079-10-1
Is the maximum tank internal inspection interval 20 years, or 30?
Both figures appear in API 653 and the difference between them is a release prevention barrier. Getting this wrong in either direction costs money — one way in unnecessary shutdowns, the other in an overdue inspection.
API 653