Installing refractory — casting, gunning, ramming and hand packing

The four ways monolithic refractory gets onto a wall, what decides quality in each, why rebound is never reused, why self-levelling castables must not be vibrated, and why plastic refractory may not have water added on site.

ProcessIntermediateAPI 936

Water, mixing and flash set — making the material on site

Why water content decides what a castable lining becomes, the water quality limits and why stainless steel tightens the chloride one, what a dirty mixer does, how flash set happens, and the temperature window installation has to sit inside.

ProcessIntermediateAPI 936

Cables — construction, selection and why sizing is never just about current

What the layers of a cable do, how power, control and instrument cables differ, the four things that decide a cable size, and why the published rating is never the rating you get.

ElectricalBeginnerIEC 60502IEC 60364-5-52+2

Instrument installation and loop checking — where most readings go wrong

Hook-up drawings, why impulse lines must slope the right way, what a manifold is for, and the commissioning sequence that catches problems before the plant does.

Instrumentation & ControlIntermediateISA 5.1IEC 61511+1

Impulse lines and tapping points — the error calibration cannot remove

Where to tap and which way to slope for gas, liquid and steam, condensate pots and why they must match, the three-valve manifold sequence that overranges cells, freezing and tracing, and how to recognise an installation fault from the trend.

Instrumentation & ControlIntermediateIEC 61511NAMUR NE 107+1

Thermowell integrity — the only instrument that can become a loss of containment

Immersion depth against stem conduction error, vortex shedding and the ASME PTC 19.3 TW calculation, why the measurement and mechanical requirements pull in opposite directions, tapered and stepped wells, and what to check when one has already failed.

Instrumentation & ControlIntermediateASME PTC 19.3 TWIEC 61511+2