API 686
Recommended Practice for Machinery Installation and Installation Design
How rotating machinery is installed: foundations and grouting, soft foot, piping strain, and the cold alignment offsets that bring a machine into alignment once it has grown to running temperature.
This is an explanation, not the standard. AlpineTutor is not affiliated with API and reproduces no part of the document. Always work to the current edition of the standard itself and to your project specification.
Where it is applied on this site
- Piling and deep foundations — necking, founding stratum and integrityCivil & Structural
- Equipment and compressor foundationsCivil & Structural
- Nozzle loads and allowables — the constraint that really governs hot pipingMechanical
- Pump piping layout — the suction side is where the decisions are madeMechanical
- Access, operability and maintenance space — what the plant is judged on afterwardsMechanical
- Vibration and alignment — reading a spectrum and getting the shaft straightRotating Equipment